Unit Testing
|
Integration Testing
|
||
1
|
It do not occurs after and before of
anything.
|
It occurs after Unit Testing and
before System Testing.
|
|
2
|
It is not abbreviated by any name.
|
It is abbreviated as “I&T” that
is why sometimes also called Integration and Testing.
|
|
3
|
It is not further divided into any.
|
It is further divided into Top-down Integration, Bottom-Up Integration and so on.
|
|
4
|
It may not catch integration errors,
or other system-wide issues because unit testing only tests the functionality
of the units themselves.
|
Integration testing uncovers an error
that arises when modules are integrated to build the overall system.
|
|
5
|
The goal of unit testing is to
isolate each part of the program and show that the individual parts are
correct.
|
The goal of Integration Testing is to
combined modules in the application and tested as a group to see that they
are working fine.
|
|
6
|
It does not follow anything.
|
It follows unit testing and precedes
system testing.
|
|
7
|
It obviously starts from the module
specification.
|
It obviously starts from the
interface specification.
|
|
8
|
Unit testing always tests the
visibility of code in details.
|
Integration testing always tests the
visibility of the integration structure.
|
|
9
|
It requires complex scaffolding means
frame.
|
It requires some scaffolding means
frame.
|
|
10
|
It definitely pays attention to the
behavior of single modules.
|
It definitely pays attention to the
integration among modules.
|
|
11
|
It is only the kind of White Box
Testing.
|
It is both the kind of Black Box and White Box Testing.
|